By 2030, according to experts, Russia's share in the global LNG market could grow to 15 percent. The liquefied gas that has not yet been produced has already been sold for 20 years ahead. And today, despite the sanctions, the Yamal LNG project does not slow down.

In April, a tour of the construction site was held for the leadership of the Yamal municipalities. The heads of cities and districts were invited to see for themselves the scope and prospects of the strategic idea.

The scale of this construction is best seen from the air. A couple of years ago there was nothing here but old barracks. And now the village even has its own airport. It opened only in February, and has already received 18,000 passengers.



Since February of this year, Yamal LNG has been organizing regular passenger flights to the cities of Novy Urengoy and Moscow, with the subsequent expansion of the route network. The airport is primarily designed to serve shift personnel, this year the planned number of passenger traffic will be about 150 thousand people, and in the peak years of the project implementation it will exceed 300 thousand people.



The commissioning of a modern international airport built as part of the large-scale Yamal LNG project is important event not only for the Yamalo-Nenets Autonomous Okrug, but for the whole of Russia. Given the active development of the Arctic, the Sabetta airport can be widely used in servicing passenger and cargo transportation in this remote region, including international ones.



Sabetta International Airport is one of the first Russian Arctic airports built from scratch. The airport corresponds to the first category of ICAO and can receive almost all types of aircraft. LLC "Sabetta International Airport" has a certificate of conformity of the aerodrome, a certificate of state registration airfield, certified for all types of airport activities.



For the first time, all the heads of the Yamal municipalities gathered in Sabetta. The tour starts from the territory of the future plant, there is still a pile field.




Giant reservoirs have already grown nearby, from which liquid gas will be pumped into gas tankers. Guaranteed reserves of the South Tambeyskoye field, the gas of which will be processed, are 1.2 trillion cubic meters of blue fuel. The Yamal LNG plant will produce 16.5 million tons of liquefied gas per year. At the same time, a resource base has been prepared, which makes it possible already today to create a capacity of up to 70 million tons of LNG in the area of ​​the Sabetta port under construction.



About 9 thousand people already work in Sabetta. At the peak of construction, there will be 15,000 of them, and a new one is quickly being built on the site of the old village. The construction has already given work to many Yamal residents. But the main thing, of course, is ahead.


“Currently, construction is underway. The site employs 9,000 people. In February alone, 65 ships were accepted. The project is already in a high degree of implementation, probably 30 percent of the main work has been completed, all horizontal works have been completed, piles have been driven, large RVSs for liquefied natural gas are being installed, ”said Dmitry Kobylkin at a working meeting with Russian President Vladimir Putin in March this year.


Investment projects implemented in Yamal, such as Yamal LNG, the Sabetta port, the Bovanenkovskoye field, the Northern Latitudinal Railway and others, are the growth driver of the Russian economy, so the pace of their implementation should not slow down. This was stated by the Governor of the Tyumen region Vladimir Yakushev at the IV International Conference "Yamal Neftegaz-2015", held on the 20th of May in Salekhard.








“The Tyumen Region is actively involved in the implementation of investment projects on the territory of the district, however, the government of the region directs efforts to expand cooperation, in this matter we find understanding both from the leadership of the district and from representatives oil and gas industry”, — said Vladimir Yakushev.


“Yamal is not only a Russian, but also a global pantry. In the next 50-60 years, at least, this region will be the main point of growth for our country. The infrastructure is already quite developed here, the region is rich natural resources. The Polar Urals, the Arctic shelf, many oil and gas fields, proven reserves in them - this suggests that Yamal will remain the main driver of Russian economic growth in the near future, ”said the head of the region.



According to him, the development of Yamal will also have a favorable effect for the Tyumen region. Research institutes, design institutes, oil service companies, machine-building enterprises oriented towards oil and gas production in Khanty-Mansi Autonomous Okrug and YaNAO are traditionally developing in the region and working for the large Tyumen region.



“In the long term, approximately 50-60 years, Russia has no other such powerful project as Yamal. Today, its development gives jobs to specialists and orders to enterprises throughout the country,” he noted, comparing the importance for the state of the development of the peninsula with the great era of the formation of the fuel and energy complex of Western Siberia.




The head of the region emphasized the great role of oil and gas companies in the development social sphere, healthcare, education. “These investments pay off a hundredfold, because we invest in people, invest in the future, this is our common cause,” summed up Vladimir Yakushev.


Through the port of Sabetta, along the Northern Sea Route, not only liquefied natural gas, but also other cargoes should be transported. This was stated on May 27 by Igor Kholmanskikh, Plenipotentiary Representative of the President of the Russian Federation in the Urals Federal District, at a press conference in Yekaterinburg.





“At the construction of a plant for the production of liquefied natural gas within the framework of the Yamal LNG project, 90 percent of the main and auxiliary sites have been prepared. The installation of foundations for gas turbine units is underway. Liquefied natural gas storage tanks are in varying degrees of readiness. Only domestic contractors take part in the implementation of the Yamal LNG project, all work is carried out by Russian workers and specialists,” emphasized the Plenipotentiary Representative of the President of the Russian Federation.



About 14,000 people will be employed during the construction of the plant, and after its completion in 2018, 1,400 jobs will be recognized at the enterprise, Igor Kholmanskikh said.

northern path




Sabetta received more than 1.1 million tons of cargo in 2014, demonstrating an almost threefold increase. Thus, the Yamal port under construction now provides almost a third of all traffic along the Northern Sea Route. This year, Sabetta is to unload three million tons of cargo ashore, of which two million will be delivered along the Northern Sea Route. These are modular structures of the future natural gas liquefaction plant, elements of LNG storage tanks, drilling and other equipment. And already in 2017, the shipment of the first batches of products will begin. From 2020, it is planned to poison 16.5 million tons of liquefied gas and 1.2 million tons of condensate from Sabetta annually.



Right on time



Leonid Mikhelson, head of NOVATEK, assures that the Yamal LNG project will be completed on time. The first stage of the plant, designed to liquefy 5.5 million tons of natural gas from the Yuzhno-Tambeyskoye field, is promised to be launched in 2017. In total, they plan to build three lines. The cost of the project exceeds $27 billion. At present, however, there are technical difficulties by the currency in which funds are raised from Chinese banks. However, all problems must be resolved before the end of the first half of the year.

Will China help?

The Yamal LNG project may receive financing from Chinese banks. Up to $13.5 billion can be transferred by the end of 2015. According to Bloomberg, citing financial director French oil and gas company Total Patrick de la Chevardie, Chinese banks signed a preliminary agreement on lending to Yamal LNG. Chevardier also announced the continuation of negotiations with export credit agencies to obtain additional funding.

At the same time, the management of Yamal LNG was forced to start negotiations with foreign shipping companies. Sovcomflot, which won the tender earlier, was unable to conclude an agreement with Daewoo Shipbuilding & Marine Engineering on the construction of five icebreaker-type gas carriers. Although under the terms of the contract he was obliged to do this last year. Therefore, Yamal LNG itself has entered into an appropriate agreement with a Korean shipyard and is now looking for buyers for the ships.

Around the world

Yamal LNG expects to receive up to $13.5 billion from Chinese banks. Earlier, the Ministry of Finance of the Russian Federation bought the company's bonds for 74.9 billion rubles. This is only half the amount approved by Dmitry Medvedev's government. In addition, an agreement was signed with the Belgian Fluxys LNG, which undertakes to build a tank for storing liquefied gas with a set of related equipment in Zeebrugge. In turn, Yamal LNG will receive the right to the exclusive use of these facilities. The cost of this agreement exceeds one billion euros, which the Russians undertake to pay to the partner within 20 years from the date of commencement of gas transshipment. The adopted scheme of supplies along the Northern Sea Route provides that in the summer period hydrocarbons will be exported by reinforced ice-class tankers directly to the markets of the Asia-Pacific region, and in winter they will be transshipped in Zeebrugge on conventional tankers for subsequent transportation through the Suez Canal.

On the world stage

Eugene Kot, CEO Yamal LNG noted the ever-increasing role of liquefied natural gas in the global energy balance. Due to the shift in demand to new markets, primarily in the Asia-Pacific region, traditional pipeline supplies are often simply technically impossible.

The development of LNG projects is the future of Russian gas on the world stage, the speaker is convinced. - Our company implements pilot project in Yamal, designed to produce 16.5 million tons of liquefied gas per year. At the same time, a resource base has been prepared, which makes it possible already today to create a capacity of up to 70 million tons of LNG in the area of ​​the Sabetta port under construction. Our efforts should be directed towards the realization of precisely such global goals. And here coordination between the government and subsoil users is extremely important. The following projects will use the experience we have already gained, run-in technologies and equipment, with the maximum possible localization of production in Russia.

Didier Barbandière, Vice President of Technip, assures that international sanctions will in no way affect the success of the Russian-French-Chinese project. The plant in Yamal will ship the first batch of gas from Sabetta via the Northern Sea Route in 2017. The French have a lot of experience in this matter. It was Technip that, using its own technology, back in the 1960s built the very first LNG plant on the planet - in Africa.

Sabetta is class!


The Yamal LNG Arctic project, which Russian NOVATEK is implementing jointly with French and Chinese partners, continues to develop rapidly. If in the outgoing year 27 ships with cargo arrived at the port of Sabetta, which is still being developed, from abroad, then next year it is planned to pass 100-150 ships through customs, which will deliver more than three million tons of imported cargo to the construction site. The creation of a full-fledged seaport is planned to be completed by 2016.



And already in 2017, despite all international sanctions, Sabetta promises to send for export the first gas carrier with liquefied natural gas from the Yuzhno-Tambeyskoye field. Dmitry Kobylkin, Governor of Yamal, is convinced that after the completion of the construction of a multifunctional seaport in Yamal and railway to Sabetta, many Russian regions through the Northern Sea Route will have access to the oceans. This project will open up new opportunities for further development of the Arctic territories.


On April 7, 2005, JSC Yamal LNG was registered in the village of Yar-Sale. The company was established with the aim of participating in the large-scale Yamal LNG project. The objectives of the project are the development of the Yuzhno-Tambeyskoye gas condensate field. The project includes a plant for the production of liquefied gas, sea ​​port and an airport in near the village of Sabetta, as well as the construction of a tanker fleet. The project is planned to be implemented in three stages. The first stage was planned to be completed by 2017, but at the end of 2014 the company announced a later date for the completion of the facility. The exact date was not specified. You can track the stages of construction of a unique complex on the official website of the company. As of the beginning of 2015, there were active construction works, and the airfield was launched. Almost all vacancies at the enterprise involve a rotational work method. Information about the watch as a driver, electrician, security guard, handyman, for women or a builder can be found on the official website of the organization. Also on the company's portal you can read the reviews of employees.

YAMAL LNG shift work

It is planned to invest more than a trillion rubles for the implementation of the Yamal LNG project over the entire construction period. Mostly it is the money of private investors. The state took over part of the financing for the construction of a seaport and an airport near the village of Sabetta. The controlling stake in OAO YAMAL LNG is owned by Novatek - 60%. Another 20% is shared between the companies "Total" and the Chinese "CNPC". Upon completion of the project, this complex will become the largest production and transshipment of liquefied natural gas in Russia. More than 3,000 people are working on its implementation today. Constant need fresh workforce, demanded vacancies are constantly open: electrician, driver, handyman, security guard.

YAMAL LNG official site vacancies watch Sabetta

According to the reviews of employees published on the official website of the company, the salary at the enterprise is high. Many vacancies are rotational, including for women. Watch driver is the most paid. Place of work: Tyumen region, Khanty-Mansi Autonomous Okrug - Yugra.

You can find out about career opportunities in the organization in the "Personnel" section of the official website of OAO Yamal LNG. Residents of the settlements of Sabetta and Yar-Sale have the opportunity to learn about vacancies directly in the company's personnel department. Address personnel department: v. Yar-Sale, st. Hoodie Seroko, 25-a.

Job on a rotational basis at the Yamal LNG project in Sabetta. The vacancies of which are posted on the official website. The professions in demand for men and women are a driver, a technician, a mechanic, a welder, an installer, an electrician, a commandant, a cook, etc. In 2019, Yamal LNG OJSC plans to put into operation one production line of a liquefied gas plant every year, therefore question, Yamal LNG – vacancies, this moment very up to date.

Shift work and vacancies Yamal LNG in the shift camp. Reviews of employees about work in the North. How to get a job at Sabetta as a shift. HR Contacts direct employer. Are there vacancies for women. Professions handyman, driver, electrician. Vacancies of the YAMAL LNG company for shift work for 2019 at Sabetta - an integrated project for the production, liquefaction and supply of natural gas. You can find out how to get a job in a company, what kind of work they offer in the North on the official website. And also on specialized resources for posting vacancies.

Fill out your CV ➤

Contacts of the personnel department for employment, telephone, current vacancies available on the official website of Yamal LNG http://yamallng.ru/career/open_vacancies/ - select an open vacancy from the list and on this page there will be a button "send finished resume". The text and vacancies posted below are for reference only.

Work on the Yamal LNG on a rotational basis

The company conducts personnel and social policy in compliance with the most stringent and highest international standards. Yamal LNG - vacancies for representatives of various specialties, workers from different countries take part in the implementation of the project.

Fill out your CV ➤

In addition to the construction of the plant, a modern airport is being built for international communication and seaport, as well as other transport infrastructure facilities. The construction of the plant is carried out in several stages, the launch of which is planned in 2019-2019. Up to 16 million tons of LNG will be supplied annually to Europe and the Asia-Pacific region, in addition, up to 1.2 million tons of gas condensate will be sold.

Working conditions in Yamal LNG are constantly improving, so they are safe and comfortable, all workers are provided with a full social package, medical insurance, and there is an opportunity to take advantage of health resorts. The company is actively developing, therefore qualified workers of various specialties are constantly required.

Today, there is a large selection of vacancies, and you can apply for one that matches your education and work experience. The most relevant vacancies: managers, IT-specialists, financial and economic specialists, chemical analysis laboratory assistants, engineers in various areas of work, process plant operators.

Yamal LNG - vacancies for specialists different specialties. The main advantages that allow the company to successfully compete in today's market:

  • deposits are located on land and have a high concentration;
  • development technologies are well developed;
  • studied geology;
  • minimum funds are spent on field development and gas production;
  • climatic conditions make it possible to effectively carry out the liquefaction process;
  • established market in Europe and the Asia-Pacific region;
  • tax breaks and another governmental support.

Many vacancies require people with similar work experience, but there are also those where they accept without work experience, for example, laborers, drivers of various driving categories, there are also vacancies for women.

Vacancies in gas production in Yamal

It is planned to produce gas from 208 wells, it will be supplied to the market in liquefied form, therefore, starting from 2017, three technological lines are commissioned, each with a capacity of 5.5 million tons of liquefied gas per year.

An unloading rack with two berths is being equipped in the port of Sabetta. Cargo berths are already working, so delivery building materials held continuously throughout the year. This project provides for the construction of the largest LNG plant in Russia.

This largest enterprise on the Yamal Peninsula, which provides people in this region high paying job, the average salary is 120,000 rubles. Yamal LNG - vacancies for shift work. Usually shifts are 30/15, 30/30, 60/30, but there may be others, so when applying for a job, be prepared to leave your family, your usual life for a while and work in harsh climatic conditions.

Since the construction of the plant is planned until 2019, the need for new specialists will be relevant for a long time to come.

Watch in Sabetta with accommodation

The stronghold of Yamal LNG is the village of Sabetta, which has created comfortable conditions for living, recreation and leisure of workers. There are cozy canteens, a hotel, a bathhouse, a sports complex, food warehouses and other facilities. The infrastructure is constantly expanding, a laundry, living quarters, a warm parking lot, a new canteen are being built, so actual vacancies are appearing. More than 15,000 people are already involved in the implementation of this project, and if you hurry, you can soon join them.

Feedback from employees about working in the North

The project provides for the construction of a plant for the production of liquefied natural gas (LNG) on the resource base of the Yuzhno-Tambeyskoye field. The proven and probable gas reserves of the field according to PRMS standards are 926 billion cubic meters. m. As part of the implementation of the Project, a transport infrastructure is being created, including a seaport and an international class airport Sabetta.

Fresh selection of Yamal LNG vacancies for today

Welding engineer 1st category

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Technical supervision, implementation and coordination of work to determine compliance with the established requirements of the performed welding work and object (welded structure) during construction ...
…in oil and gas, oil refining and/or LNG production facilities. Knowledge of welding methods: RD, RAD. MP, MPG, AF, AAD.

Chemical engineer / Chemist engineer


Carrying out the full range of analyzes offered by the chemical analysis laboratory, including the distribution of tasks among the laboratory staff. Preparing the laboratory for accreditation…
Higher education in the field of chemistry and chemical technologies. The following courses are preferred: Chemistry for the Oil and Gas Industry, Laboratory Analysis Courses…

Electrical engineer (category 1) / supervisor (power supply section)

OAO Yamal LNG Sabetta (Yamal-Nenets Autonomous Area)
Control and supervision over compliance with the current legislation, regulatory legal acts, requirements of administrative and regulatory documents for technical condition electrical installations: PS…
Higher professional education(electricity supply / energy). Experience: At least 3 years of experience in a similar position. English language- free.

Lead Power Engineer, Power Supply Division

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Implementation of organizational and technical support full cycle or individual stages of operation of electrical installations: Substation 35/10 (6) kV, ZRU-10 (6 ...
Higher professional education (electricity supply / energy). Experience in the specialty: at least 3 years of experience in a similar position.

IT Trainer (Technical Support)

OAO Yamal LNG
Moscow, Prospekt Vernadskogo and 2 more CAREER.RU
Assembly, installation and modernization of the PC. Diagnostics of hardware and software in order to detect faults. Repair of PC hardware by replacing a faulty ...
Knowledge of PC hardware and peripherals. Knowledge of Windows XP / Vista / 7. Knowledge of basic network protocols and services.

Chemical analysis laboratory assistant

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Performing timely sampling in strict accordance with the regulatory and technical documentation and the sampling schedule. Carrying out scheduled analysis of gas samples, gas…
Higher or secondary special education in the field of chemistry and chemical technology or vocational secondary, laboratory assistant certificate 4th/5…

Treatment plant operator / chemical water treatment operator (water treatment plant, 3rd category)

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Implementation of start-up and shutdown of water treatment facilities, guided by the instructions of the senior operator of the control panel. Security safe operation technological equipment and pipelines.
Education secondary special or higher, preferably in the specialization of V&K. Availability of a qualification certificate for the operator of treatment facilities / cleaning operator Wastewater/ apparatchik…

Welding master

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Production of welded structures (products, products: metal structures, pipelines, equipment) in accordance with established requirements to quality. Analysis of the plan / schedule for the production of welded…
Secondary vocational education. Experience in certification of welding equipment and technologies. Experience in leading a link (team) of welders during welding (construction, repair) of responsible ...

Leading Specialist of the Information Systems Support Group (Sabetta, YNAO)

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Administration, work optimization information systems companies (SED Directum, 1C, Monitoring of drilling, project management systems). Administration of MS SQL 2008 DBMS…
Higher technical education. Practical experience: - Installation, configuration, administration, optimization of configurations based on 1C: Enterprise 8.2, 8.3 ...

MECHANICAL ASSEMBLY WORKER

responsibilities:

Execution of production tasks received from the master of the mechanical repair workshop for the repair of equipment and its post-repair testing;
Installation, configuration, diagnostics (troubleshooting), repair and Maintenance mechanical equipment(pumps various types, valves, gate valves, etc.);
Providing daily reporting on the work done, participating in safety meetings and informing the supervisor of any malfunctions or deviations;
Compliance with the requirements for the issuance of work permits;
Assistance in the preparation of work permits;
Receipt at the warehouse of spare parts and accessories necessary for the performance of work;

requirements:

Secondary special education;
The presence of a certificate of a Mechanic of mechanical assembly works (at least 3 categories) is mandatory;
Work experience of 5 years as a repair technician in the workshop and in the field at the enterprises of the oil and gas and petrochemical industries;
Experience with systems for issuing work permits;
Skills in determining the necessary spare parts for repair / restoration work and experience in compiling and placing requests for them;
Mandatory: experience in the revision and repair of shut-off and control valves (namely: ball and plug valves, gate valves, valves, safety valves, spring and impulse (pilot), control valves, check valves, etc.);
Experience with mechanical and hydraulic systems;
Proven skills in the use of manual and special tools (centering, for tightening, for mounting and disassembling flange connections, for working with pipelines and flexible pipes).

HEAT NETWORK SERVICE WORKER

The construction of the natural gas liquefaction plant is carried out in three phases with the launch in 2017, 2019 and 2019, respectively. The project provides for the annual production of about 16.5 million tons of liquefied natural gas (LNG) and up to 1.2 million tons of gas condensate with supplies to the markets of the Asia-Pacific region and Europe.
The project is being implemented by OAO Yamal LNG, whose shareholders are largest companies in the field of production and processing of hydrocarbon raw materials: OAO NOVATEK - 60%, Total - 20%, CNPC - 20%.

Personnel policy

OAO Yamal LNG in its activities complies with high international standards in matters of social and personnel policy. Our project is implemented by representatives of various nationalities and states. A common goal and a strong team are the main conditions successful implementation project. The company creates comfortable and safe working conditions, takes care of social security workers, providing compensation, voluntary medical insurance, the possibility of health resorts and recreation.

Fill out your CV ➤

OAO YAMAL LNG is actively growing company interested in cooperation with highly qualified specialists.

Vacancies watch on Sabetta

Moscow (5)
MANAGER OF INVESTMENT PLANNING AND FINANCIAL ANALYSIS DEPARTMENT (DECRET RATE)
CHIEF SPECIALIST OF THE DEPARTMENT OF INFORMATION TECHNOLOGIES (MOSCOW)
ENGINEER OF 1 CATEGORY
HVAC engineer
CHIEF SPECIALIST OF THE FINANCIAL AND ECONOMIC DEPARTMENT
Sabetta/LNG plant (46)
________________________________________
DEPUTY HEAD OF THE CORROSION GROUP
HEAD OF THE SECTION OF GENERAL FACILITIES
DEPUTY HEAD OF THE GROUP OF ELECTRICAL EQUIPMENT OF GENERAL FACILITIES, POWER PLANT, STORAGE AND SHIPMENT OF FINISHED PRODUCTS
SENIOR ELECTRIC ENGINEER (PROCESS LINES SECTION)
ENGINEER 1 CATEGORY (EQUIPMENT OVERHAUL GROUP)
Mechanical engineer of the 1st category (designer)
Senior Civil & Structural Engineer
ENGINEER FOR EQUIPMENT MAINTENANCE PLANNING AND PPR
ENGINEER OF THE CONTROL SYSTEM AND DIAGNOSIS OF THE TECHNICAL CONDITION OF THE EQUIPMENT
REPAIR ENGINEER 1 CATEGORY PRODUCTION AND TECHNICAL DEPARTMENT
PROJECT ENGINEER 2 CATEGORY / JUNIOR PROJECT ENGINEER
CHEMICAL ENGINEER
ENGINEER 2 CATEGORY (JUNIOR SHUTDOWN ENGINEER)
1st CATEGORY ENGINEER / PROCESS CONTROL TECHNOLOGIST
SENIOR ELECTRIC ENGINEER (GENERAL FACILITIES)
ENGINEER-INSPECTOR 1 CATEGORY
ENGINEER-INSPECTOR 2 CATEGORIES
ENGINEER 1 CATEGORY FOR THE DEVELOPMENT OF PROCEDURES FOR THE MAIN PRODUCTION SYSTEMS AND INSTALLATIONS OF THE PROCESS LINE SECTION
ENGINEER 1 CATEGORY HVAC / HVAC ENGINEER
DESIGN ENGINEER
TECHNOLOGY ENGINEER 2 CATEGORIES
PROJECT ENGINEER / PROJECT ENGINEER
REPAIR MANAGER OF TECHNOLOGICAL EQUIPMENT
CIVIL AND STRUCTURAL ENGINEER
OPERATOR OF PROCESS PLANTS OF THE 7TH DISTRIBUTION OF THE LNG PLANT OF THE SECTION OF PROCESSING LINES
Head of estimate and contract department / Head of project service & control
CHEMICAL ANALYSIS LABORATORIST 4-5 DISCHARGE
ENGINEER 2 CATEGORY (VIBROMONITORING AND CONTROL GROUP) / JR. CONDITION MONITORING ENGINEER
OPERATOR OF TECHNOLOGICAL INSTALLATIONS (CENTRAL CONTROL PANEL) OF THE AREA OF ENTRANCE FACILITIES
HEAD OF THE GROUP OF METROLOGISTS
FAULT SCOPE ENGINEER 1 CATEGORY / NDT ENGINEER
ENGINEER 1 CATEGORY FOR PRODUCTION PLANNING
DEPUTY PROJECT ENGINEERING MANAGER
TECHNICAL ASSISTANT
SENIOR INSTRUMENT ENGINEER
Operational readiness engineer / OR&A engineer
ENGINEER OF THE CONTROL SYSTEM AND DIAGNOSIS OF THE TECHNICAL CONDITION OF THE EQUIPMENT
CORROSION ENGINEER 2 CATEGORY
OPERATOR OF PROCESS PLANTS 8 DISCHARGE OF LNG PLANT, SECTION OF PROCESS LINES
ELECTRIC ENGINEER 1 CATEGORY
HEAD OF THE LABORATORY FOR METROLOGY OF THE DEPARTMENT OF APCS AND INSTRUMENTATION
Project Engineer / Front End Project Engineer
SENIOR CHEMICAL ANALYSIS LABORATORIST
ENGINEER 2 CATEGORY (ROTATING EQUIPMENT) / JR. ROTATING EQUIPMENT SPECIALIST
ENGINEER 1 CATEGORY (OR&A ENGINEER)
Sabetta - .
________________________________________
SPECIALIST OF THE DEPARTMENT OF CONTROL OF TECHNICAL DOCUMENTATION (CLOCK 30/30)
TRANSLATOR
HEAD OF ENVIRONMENTAL PROTECTION SERVICE
CHIEF SPECIALIST OF INFORMATION SECURITY DEPARTMENT (SABETTA)
DEPUTY HEAD OF THE ENVIRONMENTAL PROTECTION SERVICE
Electrician 3-4 category
Locksmith - machinist

Yamal LNG is an integrated project for the production, liquefaction and sale of gas
Competitive advantages
traditional high concentration reserves located on land
well-studied geology and proven development technologies
very low development and production costs
high efficiency of the liquefaction process due to low average annual temperature
access to the markets of Europe and the Asia-Pacific region
government support, including tax incentives

Project infrastructure

The field development project provides for the drilling of 208 wells at 19 well pads. The gas produced at the field will be supplied to international market in the form of LNG, for which a gas liquefaction plant will be built, consisting of three technological lines with a capacity of 5.5 million tons of LNG per year each. The infrastructure for loading LNG for export will consist of an unloading rack with two berths in the port of Sabetta, equipped with ice protection facilities. Reinforced ice-class tankers "Arc7" will be used for LNG transportation.

Project implementation status

The final investment decision on the project was made in December 2013, and the start of LNG production is scheduled for 2017.
The main tenders have been completed and key contracts for the supply of materials and equipment and the provision of design and construction services have been concluded. More than 95% of the LNG plant's output has been contracted. The operation of cargo berths in the port of Sabetta has begun, providing year-round delivery of construction cargo. Production drilling and construction and installation works are underway at the facilities of the LNG plant. At the end of 2016, the project was approximately 75% complete.

As part of the Yamal LNG project, it is planned to build the country's largest plant for processing and producing LNG (liquefied natural gas), capable of developing a capacity of about 16,500,000 tons annually based on the resources of the Yuzhno-Tambeyskoye field.
According to PRMS standards, proven and probable reserves gas field equal to about 900 billion cubic meters. This project involves the implementation of communication paths:
sea ​​port,
transport structure,
modern airport Sabetta.

Work at Yamal LNG

OAO Yamal LNG is one of the leading companies in the region on the Yamal Peninsula, located beyond the Arctic Circle. This venture is a joint venture, where NOVATEK owns a controlling stake, TOTAL, CNPC and the Silk Road Fund are involved.
Wage in Yamal LNG starts from 120,000 rubles.

This structure assumes a large number of jobs for. This direction is widely demanded among applicants who are ready to break away from their usual life and move into conditions of hard work for a period of one month or more. The shift schedule is built mainly as follows: 30/15, 30/30, 60/30 - however, there are other options.
Working conditions
The construction of the plant is planned in three phases:
2017
2019
2019
Accordingly, actual vacancies in the project will appear for a long time. Direct employers are ready to offer Better conditions for shift work in the gas industry.
The Yamal LNG plant is located above the Arctic Circle on the northern Yamal Peninsula, at the site of the South Tambeyskoye natural gas field. Construction is successfully carried out in 3 phases in 2017, 2019 and 2019. The natural gas processing project plans to annually produce liquefied gas from 16.5 million tons and up to 1.2 million tons of gas condensate for the market of the Asia-Pacific region and Europe. Job vacancies at the Yamal LNG plant will be available below.

Yamal LNG – Shift Job Search: Latest Vacancies

The shift method is becoming increasingly attractive to many applicants today due to the high salary offered and trips to different regions of the country. Thus, many specialists are interested in vacancies at Yamal LNG with the opportunity to consistently receive a good salary, new experience and build a successful career.

To get acquainted with such job offers, it is proposed to take advantage of the extensive opportunities that open up to users on the worldwide web on the site dedicated to employment. Lots of fresh announcements are constantly added here. Each of them indicates the basic information on a specific specialty that is of interest to applicants. According to it, it becomes clear how the offer suits the specialist in terms of salary, region of work, responsibilities and other aspects.
Yamal LNG

Yamal LNG is a gas producing company. The project is aimed at the active construction of a plant intended for the production of natural liquefied gas. Within its framework, it is planned to create the necessary facilities.

The project provides for the following areas for natural gas:

  1. mining;
  2. liquefaction;
  3. supplies.

The advantages include having a good resource base as well as a good location, which in combination allows you to achieve excellent results.

This is also facilitated by the work of highly qualified employees who work in various specialties, applying directly in practice the entire volume of their professional knowledge and practical skills.

Current vacancies

On the Internet today it is easy to find a lot of job offers in the company in the following areas:

  • operator filling station, treatment facilities;
  • laboratory assistant;
  • storekeeper of fuel and lubricants;
  • instrumentation fitter;
  • translator;
  • geologist;
  • gas cutter;
  • Lead Engineer;
  • process engineer;
  • head of the workshop, department;
  • Instructor;
  • technician;
  • finisher;
  • economist;
  • insulator;
  • head of laboratory;
  • accountant;
  • crane operator;
  • chemical engineer;
  • installer;
  • foreman;
  • slinger;
  • driver;
  • mason;
  • driver;
  • Chief Specialist.

From this extensive list, it becomes clear that the company requires qualified employees in many specialties. Each job at Yamal LNG for vacancies provides for its own list of requirements for candidates and professional duties.

Working conditions

The offered vacancies are of interest to applicants due to attractive conditions. So, employees are provided with everything necessary, officially registered, in accordance with all relevant labor legislation.

Benefits include offering a high and stable salary for interesting work in a friendly team with the opportunity to gain experience, new knowledge, the realization of all their professional potential, as well as advanced training. Rotational vacancies at Yamal LNG are distinguished by a convenient work schedule, long vacations, and the opportunity to travel to the regions of the country.

LNG PLANT IN YAMAL

An LNG plant with a capacity of about 16.5 million tons is being built right at the South Tambeyskoye gas field, in the Gulf of Ob. The construction involves a modular type of installation, which seriously reduces the financial costs of construction and determines the schedule for the implementation of the project. This project will contain 3 natural gas liquefaction lines with a capacity of 5.5 million tons each year. The first launch is planned for 2017. Taking into account the low average Arctic temperatures, much less specific energy is required for the gas liquefaction process, which makes it possible to achieve large volumes of LNG production compared to projects located in the South and using similar equipment. the mixture from the wells of the field will pass through gas gathering networks to a single complex for gas treatment and liquefaction. Further, at the entrance of the complex there will be a separation process. The inlet facilities include units that regenerate methanol and stabilize the condensate. The separated natural gas will go to process lines, where liquefaction and purification from acid gases and methanol will take place, as well as drying and removal of mercury, extraction of ethane, propane and other heavy hydrocarbons. Further, already purified natural gas will be supplied for cooling and liquefaction. LNG will go for further storage in closed-type isothermal tanks. It is planned to build 4 tanks with a capacity of 160,000 cubic meters each. m. each. Work at the LNG plant IN YAMAL vacancies - read on.

VILLAGE SABETTA - FOR RESIDING OF WORKERS

The village of Sabetta, located on the eastern side of the Yamal Peninsula, is the stronghold of the Yamal LNG. A modern infrastructure has been created here for a comfortable stay for workers, additional life support complexes have been built: a fuel and lubricants warehouse, food storage warehouses, a reliable boiler room, cozy canteens, a medical center, a hotel, a common bathhouse, a sports complex, sewerage and water treatment facilities. Another canteen, a fire station, a laundry room, a heated parking lot, and additional residential buildings for builders are being built. At the construction stage of the Project, the number of employees is already about 15,000 people. Join and you.

Open vacancies on a Yamal LNG shift:

Locksmiths of various categories (3-6);
engineers of all categories;
machinists;
inspector engineers;
technology of all directions;
entrance facilities specialists;
locksmiths of various qualifications and levels.

In addition, vacancies are often open that do not require work experience, vacancies for laborers, drivers. Also on the project there are vacancies for women.
It should be noted that JSC YAMAL LNG is one of the most attractive employers in the industry, international standards in social and personnel policy allow the company to offer the best working conditions on the market. A wide range of specialists from various countries is involved in the construction of the plant. A common goal, a close-knit team are the main components for the successful completion of the project.

Specialists on a rotational basis are offered:
1. social security;
2. various compensations (accommodation, food);
3. DMS;
4. vouchers to sanatoriums and resorts for recuperation, etc.

Urgent shift work: .

Fill out your CV ➤

Interesting VIDEO film about Yamal:

Jobs at Yamal LNG. Shift work at Sabetta

5 (100%), Ratings: 51

In 2018-2019, Yamal LNG OJSC plans to put into operation one production line of the liquefied gas plant every year, so the question, Yamal LNG is a vacancy, is currently very relevant. At Yamal LNG, there are vacancies for specialists and workers of various specialties and qualifications.

Fill out your CV ➤

Vacancies of the YAMAL LNG company in Moscow (office), on duty at Sabetta - an integrated project for the production, liquefaction and supply of natural gas. The project provides for the construction of a plant for the production of liquefied natural gas (LNG) on the resource base of the Yuzhno-Tambeyskoye field. The proven and probable gas reserves of the field according to PRMS standards are 926 billion cubic meters. m. As part of the implementation of the Project, a transport infrastructure is being created, including a seaport and an international class airport Sabetta.

Company card
YAMAL LNG company: official website - yamallng.ru.
Fresh vacancies YAMAL LNG and contacts of the HR department are available at the address, send your resume - yamallng.ru/career/open_vacancies.
Vacancies are posted only on official websites. Through them, access to all contacts and vacancies is open. Without intermediaries from a direct employer. Below is information from open sources for review.

Fill out your CV ➤

The company pursues a personnel and social policy in compliance with the most stringent and highest world standards. Yamal LNG vacancies- positions for representatives of various specialties, workers from different countries take part in the implementation of the project.

The construction of the natural gas liquefaction plant is carried out in three stages with the launch in 2017, 2018 and 2019, respectively. The project provides for the annual production of about 16.5 million tons of liquefied natural gas (LNG) and up to 1.2 million tons of gas condensate with supplies to the markets of the Asia-Pacific region and Europe.

Open vacancies Yamal LNG

In addition to the construction of the plant, a modern airport for international traffic and a seaport, as well as other transport infrastructure facilities, are being built. The construction of the plant is carried out in several stages, the launch of which is planned in 2017-2019. Up to 16 million tons of LNG will be supplied annually to Europe and the Asia-Pacific region, in addition, up to 1.2 million tons of gas condensate will be sold.

The project is being implemented by OAO Yamal LNG, whose shareholders are the largest companies in the field of production and processing of hydrocarbon raw materials: OAO NOVATEK - 60%, Total - 20%, CNPC - 20%.

Personnel policy

JSC Yamal LNG in its activities complies with high international standards in matters of social and personnel policy. Our project is implemented by representatives of various nationalities and states. A common goal and a strong team are the main conditions for the successful implementation of the Project. The company creates comfortable and safe working conditions, takes care of the social security of employees, providing compensation, voluntary medical insurance, the possibility of health resorts and recreation.

JSC YAMAL LNG is an actively developing company interested in cooperation with highly qualified specialists.

Working conditions in Yamal LNG are constantly improving, so they are safe and comfortable, all workers are provided with a full social package, medical insurance, and there is an opportunity to take advantage of health resorts. The company is actively developing, therefore qualified workers of various specialties are constantly required.

Today, there is a large selection of vacancies, and you can apply for one that matches your education and work experience. The most relevant vacancies: managers, IT-specialists, financial and economic specialists, chemical analysis laboratory assistants, engineers in various areas of work, process plant operators.

Accommodations

The stronghold of Yamal LNG is the village of Sabetta, which has created comfortable conditions for living, recreation and leisure of workers. There are cozy canteens, a hotel, a bathhouse, a sports complex, food warehouses and other facilities. The infrastructure is constantly expanding, a laundry, living quarters, a warm parking lot, a new canteen are being built, so actual vacancies are appearing. More than 15,000 people are already involved in the implementation of this project, and if you hurry, you can soon join them.

Yamal LNG vacancies— an integrated project for the production, liquefaction and sale of gas
Competitive advantages
traditional high concentration reserves located on land
well-studied geology and proven development technologies
very low development and production costs
high efficiency of the liquefaction process due to low average annual temperature
access to the markets of Europe and the Asia-Pacific region
government support, including tax incentives

Project infrastructure

The field development project provides for the drilling of 208 wells at 19 well pads. The gas produced at the field will be supplied to the international market in the form of LNG, for which a gas liquefaction plant will be built, consisting of three technological lines with a capacity of 5.5 million tons of LNG per year each. The infrastructure for loading LNG for export will consist of an unloading rack with two berths in the port of Sabetta, equipped with ice protection facilities. Reinforced ice-class tankers "Arc7" will be used for LNG transportation.

Yamal LNG - professions for specialists of various specialties. The main advantages that allow the company to successfully compete in today's market:

Fill out your CV ➤

  • deposits are located on land and have a high concentration;
  • development technologies are well developed;
  • studied geology;
  • minimum funds are spent on field development and gas production;
  • climatic conditions make it possible to effectively carry out the liquefaction process;
  • established market in Europe and the Asia-Pacific region;
  • tax breaks and other government support.

Many vacancies require people with similar work experience, but there are also those where they accept without work experience, for example, laborers, drivers of various driving categories, there are also vacancies for women.

Project implementation status

The final investment decision on the project was made in December 2013, and the start of LNG production is scheduled for 2017.
The main tenders have been completed and key contracts for the supply of materials and equipment and the provision of design and construction services have been concluded. More than 95% of the LNG plant's output has been contracted. The operation of cargo berths in the port of Sabetta has begun, providing year-round delivery of construction cargo. Production drilling and construction and installation works are underway at the facilities of the LNG plant. At the end of 2016, the project was approximately 75% complete.

It is planned to produce gas from 208 wells, it will be supplied to the market in liquefied form, therefore, starting from 2017, three technological lines are commissioned, each with a capacity of 5.5 million tons of liquefied gas per year.

An unloading rack with two berths is being equipped in the port of Sabetta. Cargo berths are already working, so the delivery of building materials is carried out continuously throughout the year. This project provides for the construction of the largest LNG plant in Russia.

This is the largest enterprise on the Yamal Peninsula, which provides people in this region with highly paid jobs, the average salary is 120,000 rubles. Yamal LNG - vacancies for shift work. Usually shifts are 30/15, 30/30, 60/30, but there may be others, so when applying for a job, be prepared to leave your family, your usual life for a while and work in harsh climatic conditions.

Since the construction of the plant is planned until 2019, the need for new specialists will be relevant for a long time to come.

As part of the Yamal LNG project, it is planned to build the country's largest plant for processing and producing LNG (liquefied natural gas), capable of developing a capacity of about 16,500,000 tons annually based on the resources of the Yuzhno-Tambeyskoye field.
According to PRMS standards, the proven and probable reserves of the gas field are about 900 billion cubic meters. This project involves the implementation of communication paths:
sea ​​port,
transport structure,
modern airport Sabetta.

Work at Yamal LNG

OAO Yamal LNG is one of the leading companies in the region on the Yamal Peninsula, located beyond the Arctic Circle. This venture is a joint venture, where NOVATEK owns a controlling stake, TOTAL, CNPC and the Silk Road Fund are involved.
Salary in Yamal LNG starts from 120,000 rubles.

This structure assumes a large number of jobs for shift work in the North. This direction is widely demanded among applicants who are ready to break away from their usual life and move into conditions of hard work for a period of one month or more. The shift schedule is built mainly as follows: 30/15, 30/30, 60/30 - however, there are other options.
Working conditions
The construction of the plant is planned in three phases:
2017
2018
2019
Accordingly, actual vacancies in the project will appear for a long time. Direct employers are ready to offer the best conditions for shift work in the gas industry.
The Yamal LNG plant is located above the Arctic Circle on the northern Yamal Peninsula, at the site of the South Tambeyskoye natural gas field. Construction is successfully carried out in 3 phases in 2017, 2018 and 2019. The natural gas processing project plans to annually produce liquefied gas from 16.5 million tons and up to 1.2 million tons of gas condensate for the market of the Asia-Pacific region and Europe. Job vacancies at the Yamal LNG plant will be available below.

LNG PLANT IN YAMAL

An LNG plant with a capacity of about 16.5 million tons is being built right at the South Tambeyskoye gas field, in the Gulf of Ob. The construction involves a modular type of installation, which seriously reduces the financial costs of construction and determines the schedule for the implementation of the project. This project will contain 3 natural gas liquefaction lines with a capacity of 5.5 million tons each year. The first launch is planned for 2017. Taking into account the low average Arctic temperatures, much less specific energy is required for the gas liquefaction process, which makes it possible to achieve large volumes of LNG production compared to projects located in the South and using similar equipment. the mixture from the wells of the field will pass through gas gathering networks to a single complex for gas treatment and liquefaction. Further, at the entrance of the complex there will be a separation process. The inlet facilities include units that regenerate methanol and stabilize the condensate. The separated natural gas will go to process lines, where liquefaction and purification from acid gases and methanol will take place, as well as drying and removal of mercury, extraction of ethane, propane and other heavy hydrocarbons. Further, already purified natural gas will be supplied for cooling and liquefaction. LNG will go for further storage in closed-type isothermal tanks. It is planned to build 4 tanks with a capacity of 160,000 cubic meters each. m. each. Work at the LNG plant IN YAMAL vacancies - read on.

Competitive advantages

    traditional high concentration reserves located on land

  • well-studied geology and proven development technologies
  • very low development and production costs
  • high efficiency of the liquefaction process due to low average annual temperature
  • access to the markets of Europe and the Asia-Pacific region
  • government support, including tax incentives


Project infrastructure

The field development project provides for the drilling of 208 wells at 19 well pads. The gas produced at the field will be supplied to the international market in the form of LNG, for which a gas liquefaction plant will be built, consisting of four technological lines. The first line of the plant with a capacity of 5.5 million tons of LNG per year was put into operation in December 2017. The infrastructure for loading LNG for export consists of an unloading rack with two berths in the port of Sabetta, equipped with ice protection facilities. Reinforced ice-class tankers Arc7 are used for LNG transportation.

Project implementation status

The final investment decision on the project was made in December 2013.

LNG production on the first production line of the plant started on December 5, 2017. Yamal LNG shipped the first batch of 170 thousand cubic meters of liquefied natural gas on December 8, 2017. In August 2018, Yamal LNG shipped the first batch of LNG after the launch of the plant's second process line. In November 2018, Yamal LNG produced the first LNG at the third production line.