Inspection of buildings and structures in what time. Stages of inspection of the condition of the building

MINISTRY OF REGIONAL DEVELOPMENT
RUSSIAN FEDERATION

ORDER

On approval of the List of types of work on engineering surveys, on the preparation of project documentation, on the construction, reconstruction, overhaul of facilities capital construction that affect the safety of capital construction projects
(as amended on November 14, 2011)

___________________________________________________________

Document as amended by:
by order of the Ministry of Regional Development of Russia dated June 23, 2010 N 294 ( Russian newspaper, N 180, 13.08.2010) (changes in the list of types of work come into force no earlier than six months from the date of their introduction) - see paragraph 4_1 of article 55_8 Urban Planning Code Russian Federation).
by order of the Ministry of Regional Development of Russia of May 26, 2011 N 238 (Rossiyskaya Gazeta, N 150, 07/13/2011);
by order of the Ministry of Regional Development of Russia dated November 14, 2011 N 536 (Rossiyskaya gazeta, N 55, 03/14/2012).

___________________________________________________________
This order was amended on the basis of the order of the Ministry of Regional Development of Russia dated June 9, 2010 N 275.
Order of the Ministry of Regional Development of Russia dated June 9, 2010 N 275 in accordance with paragraphs 18 and 19 of the Rules for the preparation of regulatory legal acts of federal executive bodies and their state registration, approved by Decree of the Government of the Russian Federation of August 13, 1997 N 1009, is subject to registration with the Ministry of Justice of Russia and can only be applied after state registration and official publication.
- Database manufacturer's note.
___________________________________________________________

Pursuant to paragraph 5 of Article 8 federal law dated July 22, 2008 N 148-FZ "On Amendments to the Town Planning Code of the Russian Federation and Certain Legislative Acts of the Russian Federation" (Sobraniye Zakonodatelstva Rossiyskoy Federatsii, 2008, N 30 (part 1), art. 3604) and in accordance with the resolution Government of the Russian Federation of November 19, 2008 N 864 "On measures to implement the Federal Law of July 22, 2008 N 148-FZ "On Amendments to the Town Planning Code of the Russian Federation and Certain Legislative Acts of the Russian Federation" (Collected Legislation of the Russian Federation, 2008, N 48, art. 5612),

I order:
1. Approve the attached List of types of work on engineering surveys, preparation of project documentation, construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities (hereinafter - the List).

2. Establish that the List does not include the types of work on the preparation of project documentation, on construction, reconstruction, major repairs in relation to objects for which the issuance of a building permit is not required in accordance with paragraphs 1-4, 5 of part 17 of Article 51 of the Town Planning Code of the Russian Federation (Collected Legislation of the Russian Federation, 2005, N 1, Art. 16; 2006, N 1, Art. 21; 2008, N 30, Art. 3616; 2009, N 48, Art. 5711; 2010, N 48, 6246; 2011, N 13, art. 1688; N 27, art. 3880; N 30, art. 4563, art. 4572, art. the number of floors is no more than three, intended for the residence of no more than two families); residential buildings with no more than three floors, consisting of several blocks, the number of which does not exceed ten and each of which is intended for one family, has a common wall (common walls) without openings with the neighboring block or neighboring blocks, is located on a separate land plot and has access to the territory common use(residential houses of the blocked building); apartment buildings with no more than three floors, consisting of one or more block sections, the number of which does not exceed four, each of which contains several apartments and common areas and each of which has a separate entrance with access to the common area.
(Paragraph as amended, put into effect on March 25, 2012 by order of the Ministry of Regional Development of Russia dated November 14, 2011 N 536. - See previous edition)

Types of work on the preparation of project documentation contained in the List can be performed individual entrepreneur independently (personally), and the types of work on engineering surveys, construction, reconstruction, overhaul - only with the involvement of employees in the manner prescribed by the legislation of the Russian Federation ).

3. Recognize as invalid the order of the Ministry regional development of the Russian Federation dated December 9, 2008 N 274 "On approval of the List of types of work on engineering surveys, on the preparation of project documentation, on the construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities" (registered in the Ministry of Justice of Russia 16 January 2009 N 13086), as well as the order of the Ministry of Regional Development of the Russian Federation of October 21, 2009 N 480 "On amendments to the order of the Ministry of Regional Development of the Russian Federation of December 9, 2008 N 274 "On approval of the List of types of work on engineering surveys, for the preparation of project documentation for the construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities" (registered with the Ministry of Justice of Russia on December 22, 2009 N 15789) from the date of entry into force of this order.

5. The control of the execution of this order shall be entrusted to the Deputy Minister of Regional Development of the Russian Federation V.A. Tokarev.

Minister
V.Basargin

Registered
at the Ministry of Justice
Russian Federation
April 15, 2010
registration N 16902

List of types of work on engineering surveys, preparation of project documentation, construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities
(as amended on May 26, 2011)

I. Types of engineering survey work

1. Works as part of engineering and geodetic surveys

1.1. Creation of reference geodetic networks

1.2. Geodetic observations of deformations and settlements of buildings and structures, movements of the earth's surface and dangerous natural processes

1.3. Creation and updating of engineering and topographic plans on a scale of 1:200-1:5000, including in digital form, survey of underground utilities and structures

1.4. Line feature tracing

1.5. Engineering and hydrographic works

1.6. Special geodetic and topographic works during the construction and reconstruction of buildings and structures

2. Works as part of engineering and geological surveys

2.1. Engineering-geological survey on a scale of 1:500-1:25000

2.2. tunneling mine workings with their testing, laboratory studies of physical mechanical properties soils and chemical properties groundwater samples

2.3. The study of dangerous geological and engineering-geological processes with the development of recommendations for the engineering protection of the territory

2.4. Hydrogeological research

2.5. Geophysical surveys

2.6. Engineering geocryological research

2.7. Seismological and seismotectonic studies of the territory, seismic microzoning

3. Works as part of engineering and hydrometeorological surveys

3.1. Meteorological observations and study of the hydrological regime of water bodies

3.2. Study of dangerous hydrometeorological processes and phenomena with calculations of their characteristics

3.3. Study of channel processes of water bodies, deformations and processing of banks

3.4. Studies of the ice regime of water bodies

4. Works as part of engineering and environmental surveys

4.1. Engineering and environmental survey of the territory

4.2. Studies of chemical pollution of soils, surface and ground waters, atmospheric air, sources of pollution

4.3. Laboratory chemical-analytical and gas-chemical studies of samples and samples of soil and water

4.4. Research and assessment of physical impacts and radiation situation on the territory

4.5. Study of vegetation, wildlife, sanitary-epidemiological and medical-biological studies of the territory*
_______________

5. Works as part of engineering and geotechnical surveys

(Performed as part of engineering-geological surveys or separately on the territory studied in engineering-geological terms for separate buildings and structures)

5.1. Sinking of mine workings with their testing and laboratory studies of the mechanical properties of soils with the determination of characteristics for specific schemes for calculating the bases of foundations

5.2. Field tests of soils with the determination of their standard strength and deformation characteristics (stamp, shear, pressuremeter, shear). Tests of reference and full-scale piles

5.3. Determination of standard mechanical characteristics of soils by methods of static, dynamic and drilling sounding

5.4. Physical and mathematical modeling of the interaction of buildings and structures with the geological environment

5.5. Special Studies soil characteristics for individual programs for non-standard, including non-linear methods for calculating the bases of foundations and structures of buildings and structures

5.6. Geotechnical control of construction of buildings, structures and adjacent territories

6. Inspection of the state of soils of the foundation of buildings and structures

7. The item was excluded from January 14, 2012 by order of the Ministry of Regional Development of Russia dated May 26, 2011 N 238. - See the previous edition.

II. Types of work on the preparation of project documentation
1. Work on the preparation of a scheme for the planning organization of a land plot:

1.1. Works on the preparation of the master plan of the land plot

1.2. Works on the preparation of a planning organization scheme for the route of a linear facility

1.3. Works on the preparation of the scheme of planning organization of the right of way of the linear structure

2. Work on the preparation of architectural solutions

3. Work on the preparation of constructive solutions

4. Work on the preparation of information on internal engineering equipment, internal networks of engineering and technical support, on the list of engineering and technical measures:

4.1. Works on the preparation of projects for internal engineering systems of heating, ventilation, air conditioning, smoke ventilation, heat supply and refrigeration

4.2. Works on the preparation of projects for internal engineering systems of water supply and sewerage

4.3. Project preparation works internal systems power supply*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

4.4. Works on the preparation of projects for internal low-voltage systems*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

4.5. Works on the preparation of projects for internal dispatching, automation and management of engineering systems

4.6. Works on the preparation of projects for internal gas supply systems

5. Work on the preparation of information on external networks of engineering and technical support, on the list of engineering and technical measures:

5.1. Works on the preparation of projects for external heat supply networks and their structures

5.2. Works on the preparation of projects for external water supply and sewerage networks and their structures

5.3. Works on the preparation of projects for external power supply networks up to 35 kV inclusive and their structures

5.4. Works on the preparation of projects for external power supply networks of not more than 110 kV inclusive and their structures

5.5. Works on the preparation of projects for external power supply networks of 110 kV and more and their structures

5.6. Works on the preparation of projects for external networks of low-voltage systems

5.7. Works on the preparation of projects for external gas supply networks and their structures

6. Preparation work technological solutions:

6.1. Works on the preparation of technological solutions for residential buildings and their complexes

6.2. Works on the preparation of technological solutions for public buildings and structures and their complexes

6.3. Works on the preparation of technological solutions for industrial buildings and structures and their complexes

6.4. Works on the preparation of technological solutions for transport facilities and their complexes

6.5. Works on the preparation of technological solutions for hydraulic structures and their complexes

6.6. Works on the preparation of technological solutions for agricultural facilities and their complexes

6.7. Works on the preparation of technological solutions for special-purpose facilities and their complexes

6.8. Works on the preparation of technological solutions for oil and gas facilities and their complexes

6.9. Works on the preparation of technological solutions for objects of collection, processing, storage, processing and disposal of waste and their complexes

6.10. Works on preparation of technological solutions for facilities nuclear energy and industry and their complexes

6.11. Work on the preparation of technological solutions for military infrastructure facilities and their complexes

6.12. Works on the preparation of technological solutions for treatment facilities and their complexes

6.13. Works on the preparation of technological solutions for metro facilities and their complexes

7. Work on the development of special sections of project documentation:

7.1. Engineering and technical measures for civil defense

7.2. Engineering and technical measures for the prevention emergencies natural and man-made nature

7.3. Development of a declaration on industrial safety of hazardous production facilities

7.4. Development of a declaration of safety of hydraulic structures

7.5. Development of justification for radiation and nuclear protection

8. Works on the preparation of projects for the organization of construction, demolition and dismantling of buildings and structures, extension of the service life and conservation *
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

9. Work on the preparation of draft measures for environmental protection

10. Work on the preparation of draft measures to ensure fire safety

11. Work on the preparation of draft measures to ensure access for people with limited mobility

12. Work on the inspection of building structures of buildings and structures

13. Works on organizing the preparation of project documentation by the involved developer or customer on the basis of a contract legal entity or individual entrepreneur general designer)

III. Types of construction, reconstruction and overhaul works
1. Geodetic work performed on construction sites

1.1. Layout work in the process of construction*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

1.2. Geodetic control of the accuracy of the geometric parameters of buildings and structures*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

2. Preparatory work

2.1. Dismantling (dismantling) of buildings and structures, walls, ceilings, flights of stairs and other structural and related elements or parts thereof*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

2.2. Construction of temporary: roads; sites; engineering networks and structures*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

2.3. Installation of rail crane tracks and foundations (supports) of stationary cranes

2.4. Installation and dismantling of inventory external and internal scaffolding, technological garbage chutes*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

3. Earthworks

3.1. Mechanized excavation*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

3.2. Soil excavation and drainage arrangement in water management construction

3.3. Soil development by hydromechanization

3.4. Works on artificial freezing of soils

3.5. Soil compaction with rollers, compactors or heavy rammers*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

3.6. Mechanized loosening and development of permafrost soils

3.7. Works on dewatering, organization of surface runoff and drainage

4. Construction of wells

4.1. Drilling, construction and installation of oil and gas wells

4.2. Drilling and construction of wells (except for oil and gas wells)

4.3. Fixing wells with pipes, extracting pipes, free lowering or lifting pipes from wells

4.4. Plugging works

4.5. Construction of mine wells

5. Pile work. Soil stabilization

5.1. Pile work performed from the ground, including in sea and river conditions

5.2. Pile work performed in frozen and permafrost soils

5.3. Grillage device

5.4. Installation of driven and bored piles

5.5. Thermal strengthening of soils

5.6. Cementation of soil bases with driving injectors

5.7. Silicization and resinization of soils

5.8. Works on the construction of structures using the "wall in the ground" method

5.9. Driving and lifting steel and sheet piles

6. Installation of concrete and reinforced concrete monolithic structures

6.1. Formwork

6.2. Reinforcing works

6.3. The device of monolithic concrete and reinforced concrete structures

7. Installation of prefabricated concrete and reinforced concrete structures

7.1. Installation of foundations and structures of the underground part of buildings and structures

7.2. Installation of structural elements of the above-ground part of buildings and structures, including columns, frames, crossbars, trusses, beams, slabs, belts, wall panels and partitions

7.3. Installation of volumetric units, including ventilation units, elevator shafts and garbage chutes, sanitary cabins

8. Drilling and blasting during construction

9. Works on the device of stone structures

9.1. Arrangement of structures of buildings and structures made of natural and artificial stones, including those with cladding*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

9.2. Installation of brick structures, including those with cladding*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

9.3. Arrangement of heating furnaces and hearths*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

10. Installation of metal structures

10.1. Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures

10.2. Installation, reinforcement and dismantling of structures of transport galleries

10.3. Installation, reinforcement and dismantling of tank structures

10.4. Installation, strengthening and dismantling of mast structures, towers, exhaust pipes

10.5. Installation, reinforcement and dismantling of technological structures

10.6. Installation and dismantling of cable supporting structures (stretch marks, cable-stayed structures, etc.)

11. Installation of wooden structures

11.1. Installation, reinforcement and dismantling of structural elements and enclosing structures of buildings and structures, including those made of glued structures*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

11.2. Assembly of residential and public buildings from prefabricated parts of a complete delivery*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

12. Protection of building structures, pipelines and equipment (except for main and field pipelines)

12.1. Lining works

12.2. Masonry made of acid-resistant bricks and shaped acid-resistant ceramic products

12.3. Protective covering paintwork materials*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

12.4. Gumming (lining with sheet rubber and liquid rubber compounds)

12.5. Glue insulation device

12.6. The device of metallization coatings

12.7. Application of a front coating when installing a monolithic floor in rooms with aggressive environments

12.8. Antiseptic treatment of wooden structures

12.9. Waterproofing of building structures

12.10. Works on thermal insulation of buildings, building structures and equipment

12.11. Works on thermal insulation of pipelines*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

12.12. Works on fire protection of building structures and equipment

13. Roofing

13.1. Installation of roofs from piece and sheet materials*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

13.2. The device of roofs from roll materials*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

13.3. Self-leveling roofing*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

14. Facade works

14.1. Surface cladding with natural and artificial stones and linear shaped stones*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

14.2. Installation of ventilated facades*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

15. Arrangement of internal engineering systems and equipment of buildings and structures

15.1. Installation and dismantling of the water supply and sewerage system *
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

15.2. Installation and dismantling of the heating system *
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

15.3. Installation and dismantling of the gas supply system

15.4. Installation and dismantling of the ventilation and air conditioning system *
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

15.5. The device of the power supply system *
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

15.6. Arrangement of electrical and other control networks for life support systems of buildings and structures*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

16. Installation of external water supply networks

16.1. Laying of water pipelines

16.2. Installation and dismantling of shut-off valves and equipment for water supply networks

16.3. Installation of water wells, caps, catchment dampers

16.4. Cavity cleaning and testing of water pipelines

17. Construction of external sewer networks

17.1. Laying of non-pressure sewer pipelines

17.2. Laying sewer pressure pipelines

17.3. Installation and dismantling of shut-off valves and equipment of sewer networks

17.4. Installation of sewer and drain wells

17.5. Arrangement of a filtering base for silt pads and filtration fields

17.6. Laying drainage pipes on sludge beds

17.7. Cavity cleaning and testing of sewer pipelines

18. Construction of external heat supply networks

18.1. Laying of heat supply pipelines with a coolant temperature of up to 115 degrees Celsius

18.2. Laying of heat supply pipelines with a coolant temperature of 115 degrees Celsius and above

18.3. Installation and dismantling of shutoff valves and equipment of heat supply networks

18.4. Arrangement of wells and chambers of heat supply networks

18.5. Cavity cleaning and testing of heating pipelines

19. The device of external gas supply networks, except for the main

19.1. Laying of gas pipelines with working pressure up to 0.005 MPa inclusive

19.2. Laying of gas pipelines with working pressure from 0.005 MPa to 0.3 MPa inclusive

19.3. Laying of gas pipelines with working pressure from 0.3 MPa to 1.2 MPa inclusive (for natural gas), up to 1.6 MPa inclusive (for liquefied hydrocarbon gas)

19.4. Installation of condensate collectors for hydraulic seals and compensators on gas pipelines

19.5. Installation and dismantling of gas control points and installations

19.6. Installation and dismantling of tank and group cylinder installations of liquefied gas

19.7. Entering the gas pipeline into buildings and structures

19.8. Mounting and dismantling gas equipment consumers using natural and liquefied gas

19.9. Tapping under pressure into existing gas pipelines, disconnection and plugging under pressure of existing gas pipelines

19.10. Cavity cleaning and testing of gas pipelines

20. Arrangement of external electrical networks and communication lines

20.1. Arrangement of power supply networks with voltage up to 1 kV inclusive *
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

20.2. Arrangement of power supply networks with voltage up to 35 kV inclusive

20.3. Arrangement of power supply networks with voltage up to 330 kV inclusive

20.4. Construction of power supply networks with voltage over 330 kV

20.5. Installation and dismantling of supports for overhead power lines with voltage up to 35 kV

20.6. Installation and dismantling of supports for overhead power lines with voltage up to 500 kV

20.7. Installation and dismantling of supports for overhead power lines with a voltage of more than 500 kV

20.8. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage up to 35 kV inclusive

20.9. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage over 35 kV

20.10. Installation and dismantling of transformer substations and linear electrical equipment with voltage up to 35 kV inclusive

20.11. Installation and dismantling of transformer substations and linear electrical equipment with voltage over 35 kV

20.12. Installation of distribution devices, switching equipment, protection devices

20.13. Arrangement of external communication lines, including telephone, radio and television*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

21. Arrangement of objects of use atomic energy

21.1. Works on the construction of facilities with nuclear installations

21.2. Works on the construction of nuclear weapons complex facilities

21.3. Works on the construction of elementary particle accelerators and hot chambers

21.4. Works on the construction of storage facilities for nuclear materials and radioactive substances, storage facilities for radioactive waste

21.5. Works on the construction of nuclear fuel cycle facilities

21.6. Works on the construction of facilities for the extraction and processing of uranium

21.7. Works on decommissioning of nuclear facilities
(Clause 21 as amended, put into effect on December 23, 2010 by order of the Ministry of Regional Development of Russia dated June 23, 2010 N 294. - See the previous version)

22. Arrangement of oil and gas industry facilities

22.1. Installation of main and field pipelines

22.2. Works on the arrangement of facilities for preparing oil and gas for transport

22.3. Arrangement of oil depots and gas storage facilities

22.4. Installation of crossing structures under linear objects (roads and railways) and other obstacles of natural and artificial origin

22.5. Works on the construction of crossings by the method of directional drilling

22.6. Device for electrochemical protection of pipelines

22.7. Tapping under pressure into existing main and field pipelines, disconnection and plugging under pressure of existing main and field pipelines

22.8. Performance of anti-corrosion protection and insulation works in relation to main and field pipelines

22.9. Works on arrangement of oil and gas fields sea ​​shelf

22.10. Works on the construction of gas filling compressor stations

22.11. Quality control welded joints and their isolation

22.12. Cavity cleaning and testing of main and field pipelines

23. Installation work

23.1. Installation of handling equipment

23.2. Elevator installation

23.3. Installation of equipment for thermal power plants

23.4. Installation of boiler room equipment

23.5. Installation compressor units, pumps and fans*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.6. Installation of electrical installations, equipment, automation and alarm systems*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.7. Installation of equipment for nuclear facilities

23.8. Installation of equipment for cleaning and preparation for the transportation of gas and oil

23.9. Installation of equipment for oil and gas pumping stations and for other product pipelines

23.10. Installation of natural gas liquefaction equipment

23.11. Installation of gas station equipment

23.12. Installation of equipment for ferrous metallurgy enterprises

23.13. Installation of equipment for non-ferrous metallurgy enterprises

23.14. Installation of equipment for the chemical and oil refining industries

23.15. Installation of mining and ore-dressing equipment

23.16. Installation of equipment for railway infrastructure facilities

23.17. Installation of subway and tunnel equipment

23.18. Installation of equipment for hydroelectric stations and other hydraulic structures

23.19. Installation of equipment for electrical industry enterprises

23.20. Installation of equipment for enterprises in the building materials industry

23.21. Installation of equipment for the pulp and paper industry

23.22. Installation of equipment for textile industry enterprises

23.23. Installation of equipment for printing industry enterprises

23.24. Installation of equipment for food industry enterprises*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.25. Installation of equipment for theater and entertainment enterprises

23.26. Installation of equipment for granaries and grain processing enterprises

23.27. Installation of equipment for cinematography enterprises*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.28. Installation of equipment for enterprises in the electronics industry and the communications industry*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.29. Installation of equipment for healthcare institutions and medical industry enterprises*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.30. Installation of equipment for agricultural production, including fish processing and fish storage*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.31. Installation of equipment for consumer services and public utilities*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.32. Installation of water intake equipment, sewerage and treatment facilities

23.33. Installation of equipment for communication facilities*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

23.34. Installation of equipment for space infrastructure facilities

23.35. Installation of airport equipment and other aviation infrastructure facilities

23.36. Installation of equipment for sea and river ports

24. Commissioning works

24.1. Commissioning of lifting and transport equipment

24.2. Commissioning of elevators

24.3. Commissioning of synchronous generators and excitation systems

24.4. Commissioning of power and instrument transformers

24.5. Commissioning of switching devices

24.6. Commissioning of relay protection devices

24.7. Commissioning of automation in power supply *
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.8. Commissioning of voltage and control current systems

24.9. Commissioning works electrical machines and electric drives

24.10. Commissioning of automation systems, alarm systems and related devices*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.11. Commissioning works of stand-alone system adjustment*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.12. Commissioning works complex adjustment systems*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.13. Commissioning of telemechanics*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.14. Adjustment of ventilation and air conditioning systems*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.15. Commissioning of automatic machine lines

24.16. Commissioning of multi-purpose metal-cutting machines with CNC

24.17. Commissioning of unique metal-cutting machines weighing over 100 tons

24.18. Commissioning works refrigeration units*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.19. Commissioning of compressor units

24.20. Commissioning of steam boilers

24.21. Commissioning of hot water boilers*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.22. Commissioning works of auxiliary boiler equipment*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

24.23. Commissioning of water treatment equipment and chemical water treatment equipment

24.24. Start-up and adjustment works of technological installations of the fuel economy

24.25. Commissioning of the gas-air path

24.26. Commissioning of general boiler systems and utilities

24.27. Commissioning of equipment for processing and finishing wood

24.28. Commissioning of drying plants

24.29. Commissioning works of water supply facilities

24.30. Commissioning works of sewerage facilities

24.31. Commissioning works at the facilities of the oil and gas complex

24.32. Commissioning work at nuclear facilities (the item was additionally included from December 23, 2010 by order of the Ministry of Regional Development of Russia dated June 23, 2010 N 294)

25. Arrangement of roads and airfields *
________________
*Probably an original error. It should read: "aerodromes". - Database manufacturer's note.

25.1. Works on the construction of subgrade for highways, airport platforms, runways, taxiways

25.2. The device of the bases of highways

25.3. Arrangement of foundations for airport aprons, runways, taxiways

25.4. Road pavement devices, including those reinforced with binders

25.5. Devices for covering airport aprons, runways, taxiways

25.6. Installation of drainage, catchment, culvert, spillway devices

25.7. Installation of protective fences and elements of arrangement of highways

25.8. Road marking device

26. Arrangement of railway and tram tracks

26.1. Works on the construction of subgrade for railway tracks

26.2. Works on the construction of subgrade for tram tracks

26.3. The device of the upper structure of the railway track

26.4. Arrangement of drainage and protective structures of the subgrade of the railway track

26.5. Installation of signaling, centralization and blocking of railways

26.6. Railway electrification

26.7. Stabilization of soils in the right of way of the railway

26.8. Construction of railway crossings

27. Construction of tunnels, subways

27.1. Sinking of tunnels and subways without the use of special methods of tunneling

27.2. Excavation of tunnels and subways using artificial freezing

27.3. Sinking of tunnels and subways using grouting

27.4. Sinking of tunnels and subways with the use of electrochemical fastening

27.5. Sinking of tunnels and subways with the use of lowering support

27.6. Arrangement of internal structures of tunnels and subways

27.7. Subway track arrangement

28. Installation of mine structures

28.1. Sinking of the development of mine structures without the use of special methods of sinking

28.2. Sinking of the development of mine structures using artificial freezing

28.3. Sinking of the development of mine structures with the use of grouting

28.4. Sinking of the development of mine structures with the use of electrochemical fastening

28.5. Sinking of the development of mine structures with the use of lowering lining

29. Arrangement of bridges, overpasses and overpasses

29.1. Installation of monolithic reinforced concrete and concrete structures of bridges, flyovers and overpasses

29.2. Arrangement of prefabricated reinforced concrete structures of bridges, flyovers and overpasses

29.3. Construction of pedestrian bridges

29.4. Installation of steel superstructures of bridges, flyovers and overpasses

29.5. Installation of wooden bridges, flyovers and overpasses

29.6. Installation of stone bridges, flyovers and overpasses

29.7. Laying culvert pipes on finished foundations (bases) and drainage trays

30. Hydraulic works, diving works

30.1. Development and movement of soil by jet and floating dredgers

30.2. Loosening and development of soils under water mechanized way and issuance to the dump or floating facilities

30.3. Drilling and construction of wells under water

30.4. Piling work performed in marine conditions from floating facilities, including the installation of shell piles

30.5. Pile work performed in river conditions from floating facilities, including the installation of shell piles

30.6. Construction of structures in sea and river conditions from natural and artificial massifs

30.7. Construction of dams

30.8. Installation, dismantling of building structures in underwater conditions

30.9. Laying pipelines in underwater conditions

30.10. Laying cables in underwater conditions, including electrical and communication

30.11. Diving (underwater construction) works, including quality control of hydrotechnical works under water

31. Industrial furnaces and chimneys

31.1. Blast furnace masonry

31.2. Masonry of the upper structure of glass melting furnaces

31.3. Installation of furnaces from prefabricated elements of increased factory readiness

31.4. Electrolyzers for the aluminum industry

31.5. Lining of industrial flue and ventilation furnaces and pipes

32. Works on the implementation of construction control by the involved developer or customer on the basis of a contract by a legal entity or individual entrepreneur

32.1. Construction control over general construction works (groups of types of work N 1-3, 5-7, 9-14)

32.2. Construction control over well construction works (group of types of work N 4)

32.3. Construction control over drilling and blasting (group of types of work N 8)

32.4. Construction control over work in the field of water supply and sewerage (type of work N 15.1, 23.32, 24.29, 24.30, groups of types of work N 16, 17)

32.5. Construction control over work in the field of heat and gas supply and ventilation (types of work N 15.2, 15.3, 15.4, 23.4, 23.5, 24.14, 24.19, 24.20, 24.21, 24.22, 24.24, 24.25, 24.26, groups of types of work N 18, 19)

32.6. Construction control over work in the field of fire safety (type of work N 12.3, 12.12, 23.6, 24.10-24.12)

32.7. Construction control over work in the field of power supply (type of work N 15.5, 15.6, 23.6, 24.3-24.10, group of types of work N 20)

32.8. Construction control during the construction, reconstruction and overhaul of communication facilities (types of work N 20.13, 23.6, 23.28, 23.33, 24.7, 24.10, 24.11, 24.12) 2010 N 294, - see the previous edition)

32.9. Construction control during the construction, reconstruction and overhaul of oil and gas industry facilities (type of work N 23.9, 23.10, group of types of work N 22)

32.10. Construction control during the construction, reconstruction and overhaul of roads and airfields, bridges, overpasses and overpasses (type of work N 23.35, groups of types of work N 25, 29)

32.11. Construction control during the construction of railway and tram tracks (types of work N 23.16, group of types of work N 26)

32.12. Construction control during construction, reconstruction and overhaul in underground conditions (types of work N 23.17, groups of types of work N 27, 28)

32.13. Construction control over hydraulic engineering and diving works (group of types of work N 30)

32.14. Construction control during construction, reconstruction and overhaul of industrial furnaces and chimneys (group of types of work N 31)

32.15. The item was excluded from December 23, 2010 by order of the Ministry of Regional Development of Russia dated June 23, 2010 N 294. - See the previous edition.

33. Works on the organization of construction, reconstruction and overhaul engaged by the developer or customer on the basis of an agreement by a legal entity or an individual entrepreneur (general contractor):

33.1. Industrial engineering

33.1.1. Enterprises and facilities of the fuel industry

33.1.2. Enterprises and facilities of the coal industry

33.1.3. Enterprises and objects of ferrous metallurgy

33.1.4. Enterprises and objects of non-ferrous metallurgy

33.1.5. Enterprises and objects of the chemical and petrochemical industry

33.1.6. Enterprises and objects of mechanical engineering and metalworking

33.1.7. Enterprises and facilities of the forestry, woodworking, pulp and paper industries

33.1.8. Enterprises and objects of light industry*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

33.1.9. Enterprises and facilities of the food industry*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

33.1.10. Enterprises and objects of agriculture and forestry*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

33.1.11. Thermal power plants

33.1.12. Nuclear facilities

33.1.13. Power supply facilities over 110 kV

33.1.14. Oil and gas facilities

33.2. Transport construction

33.2.1. Roads and road transport infrastructure

33.2.2. Railways and railway infrastructure facilities

33.2.3. Airports and other aviation infrastructure facilities

33.2.4. Road and rail tunnels

33.2.5. Subways

33.2.6. Bridges (large and medium)

33.2.7. Enterprises and public transport facilities*
_______________
* These types and groups of types of work require obtaining a certificate of admission to types of work that affect the safety of a capital construction object, if such work is performed at the facilities specified in Article 48_1 of the Town Planning Code of the Russian Federation.

33.3. Housing and civil construction

33.4. Power supply facilities up to 110 kV inclusive

33.5. Heat supply facilities

33.6. Gas supply facilities

33.7. Water supply and sewerage facilities

33.8. Buildings and facilities of communication facilities

33.9. Maritime transport facilities

33.10. River transport facilities

33.11. Hydropower facilities

33.12. Dams, dams, canals, bank protection structures, reservoirs (with the exception of hydropower facilities)

33.13. hydromeliorative facilities.

34. Works on the implementation of construction control by the developer, or by a legal entity or individual entrepreneur involved by the developer or customer on the basis of an agreement during the construction, reconstruction and overhaul of nuclear facilities (types of work N 23.7, 24.32, group of types of work N 21) (additional clause included from December 23, 2010 by order of the Ministry of Regional Development of Russia dated June 23, 2010 N 294)

Technical inspections of buildings and structures must be carried out in order to comply with safety standards and requirements. This is necessary for a thorough analysis of the state in which the structures are, making competent decisions.

Surveys on buildings and structures can:

  1. Be planned.
  2. To be carried out before re-equipment, overhaul.
  3. Conducted to assess the condition of the property when buying, selling.
  4. Be carried out after natural disasters and accidents.

Based on the results of this examination, a report is drawn up. This is a legal document full force during interdepartmental litigation. During the examination, the following methods are used:

  1. Laboratory studies of selected samples.
  2. Unbrakable control.
  3. Photofixation of defects.
  4. External inspection.

Only specialists with a special permit for the design and inspection of objects are involved in such work. A graduate degree is required.

Experts must check the condition of a particular building. Power supply system, sewerage, heating system and plumbing - data is collected on all communication systems. Specialists will indicate whether additional financial investments are needed, how efficient the work is, and to what extent certain elements are worn out.

  • Objects whose construction has not been completed are subject to survey. This will let the investor understand how expedient investments in further construction will be.
  • The technical condition of the building must also be assessed after natural accidents and disasters. The resulting damage is checked, the possibility of repair. The answer to the question is given, is it possible to further use the resources of the building?
  • Sometimes a study is necessary to understand how far the contractor has deviated from existing building codes from the original project. Thanks to this decision, it becomes clear whether such changes affect the strength characteristics.
  • If there are structural defects, it is necessary to find out how large they are. Experts find out the reasons why these defects appeared. Calculate the likelihood of certain consequences. Provide recommendations on how to avoid these consequences.

What documents are needed to join the SRO?

SRO for the inspection of buildings and structures requires the execution of a number of documents. Their minimum package includes:

  1. Information about employees and managers in the organization.
  2. Notification of the State Statistics Committee of the information type, in a copy.
  3. Information that the company is registered with the tax authorities. A copy of the TIN is provided.
  4. Extract from the Unified State Register of Legal Entities, copy.
  5. A separate certificate is submitted that an entry was made in the Unified State Register of Legal Entities. They take her to the FNS.
  6. In the same body, you must take a copy of the certificate of state registration.
  7. You can not do without an order by which they were appointed to their positions Chief Accountant, CEO.
  8. We need the statutory document of the organization, in a copy.
  9. The same goes for the protocol general meeting founders, the very decision to create a community
  10. The head signs and seals on a special questionnaire, where all the items must be filled out.
  11. When joining the SRO in a free form, an application is drawn up.

What are the steps involved in obtaining permits?

  • First, an application is made. It indicates the type of activity - for example, inspection of buildings and structures, SRO requires a listing of all types of activities, both planned and ongoing.
  • After that, the relevant authority reviews the application. And he makes a decision, positive or negative.
  • It is necessary to submit documents confirming the ability to carry out a particular type of activity.
  1. That civil liability was insured.
  2. Information about the qualifications available.
  • All documents are considered.
  • A member of the SRO pays a contribution to the compensation fund. And other contributions specified in the rules.
  • With a positive decision, at the last stage, the certificate itself is issued.

What are the requirements for future SRO members?

The set of requirements is determined individually in each self-regulatory organization. But there are basic rules that are always present:

  1. The corresponding package of documents, drawn up in accordance with all the rules.
  2. Availability of personnel and material base.

In order to become a member of a self-regulatory organization, it is necessary to have a certain staff of employees with sufficiently high qualifications. For this, short-term courses and staffing are organized. Even for highly qualified employees and higher education Must have some work experience.

  1. Insurance premiums also vary. They depend on which Insurance Company it is chosen what functions the organization itself performs, what types of work it needs to perform.
  2. Mandatory requirement is civil liability insurance. Different SROs have different insurance requirements. There is only the necessary minimum, it must comply with the text of the regulation on the compensation fund, contributions.

How to choose the right SRO?

One of the most important criteria in this case, the terms of membership. Including the amounts of various contributions. The legislation does not establish any restrictions in relation to them, therefore, in each organization, contributions are determined in their own way.

Many SROs have their own standards for members. These are clear requirements that apply to a number of works carried out in practice. SROs conduct audits that help determine whether these requirements are being met. If the company has joined just such an organization, then it becomes possible to get an additional plus to its reputation. SROs strictly control the quality of any work performed.

Reputation

Another criterion that plays an important role. It is enough to simply calculate commercial SROs, which only formally belong to this field of activity. If there are more than a thousand members with very different geography, you should refuse. It is unlikely that in such conditions the leadership competently performs all the functions assigned to it.

It is better to choose an SRO with an office in the same region where the organization itself is located. Then it will be easier to resolve issues on changing any conditions.

About local SROs

Many SROs have a clear focus on attracting partners that meet certain requirements. For example, some organizations are engaged in construction and reconstruction, others unite representatives of small businesses, road construction and so on.

Thanks to such specialized associations, it becomes easier to influence the consideration of certain initiatives in legislation. Well, if there is an opportunity to get an interest-free, long-term installment plan for any compensation payment. It is recommended to choose partners who, if necessary, can reissue documents literally in 3 days.

Today, technical and construction expertise, which consists in a comprehensive survey of the state of the building, is a landmark tool for minimizing various risks that arise during the operation of buildings of various specifications. In addition, a survey of buildings and structures allows us to conclude that the facility is suitable for further use, as well as assess the need for major repairs, reconstruction or complete dismantling.

The technical inspection of buildings is entrusted to specialized expert companies that are members of the respective self-regulatory organizations(). All experts involved in the survey of the status of the task must have the appropriate permits, experience, and qualifications. Terms of inspection of building structures are established general rules and norms separately for each type of buildings and structures. Usually, expert organizations, engaged in such work, insure civil liability to third parties (customers), which allows you to make appropriate claims, as well as receive compensation in case of professional errors.

When is a building inspection carried out?

1.​ If the object is in an emergency state.

2.​ If the life of the building has exceeded the established norms.

3.​ If, upon the occurrence of an insured event, an examination of the object is needed, carried out in order to determine the amount of compensation payments.

4. To determine the need for major repairs or reconstruction.

5. Scheduled inspection of buildings and structures, carried out for preventive purposes.

The main task of a regular or unscheduled survey of buildings and structures is to determine current state all the main components of the object. As side tasks, there is an assessment of the compliance of all elements of the infrastructure with existing norms, standards, as well as conclusions about the need for repair or reconstruction.

The main purpose of the technical inspection of buildings is to ensure the safety of further operation of objects, taking into account all objective and subjective factors that affect the use of this building or structure for its intended purpose.

Methods of technical inspection of buildings

The main methods of surveying building structures can be listed as follows:

Visual technique - a thorough inspection of various areas in order to identify obvious defects. The main advantage of visual research is the speed of obtaining data on the state of various parts of the object. However, this method should be used in combination with other technologies for examining buildings and structures, since external inspection does not allow detecting hidden defects.

Mechanical research, which is carried out by direct impact on specific sections of structures. The advantages of this technology lie in the possibility of evaluating physical and chemical properties individual structures in the field.

Laboratory examination. The most accurate method of technical inspection of buildings, which is characterized by a rather high cost and labor intensity. Laboratory research is carried out within the framework of complex, most valuable objects. The best option such tests are methods of non-destructive testing and flaw detection.

Comprehensive expertise. Includes all of the above methods, as well as innovative techniques such as radiometry, computer analysis, acoustic research.

A reasonable choice of methods for examining the state of the building allows you to reduce the cost of conducting an examination without losing the effectiveness of the research.

Stages of inspection of the condition of the building

1.​ Preliminary inspection, acquaintance with design and technical documentation, assessment of operating conditions. On this stage it is very important to find out the degree of wear of structures and determine the main negative factors affecting the overall safety of operation.

2.​ Detailed study the state of the infrastructure of the facility with appropriate measurements, visual assessment of damage, placing beacons on cracks, etc.

3. Determination of the magnitude and nature of static, dynamic loads on load-bearing elements.

4. Examination of obvious and hidden defects using mechanical and visual methods.

5. Conducting field and laboratory tests.

6. Final calculations, development of schemes, drawings.

As a rule, technical inspection of building structures is carried out on the basis of written agreements between the customer and the contractor with the inclusion of well-written technical specifications in the contract. The design and technical documentation of the object is the basic document, according to which the expert work plan is drawn up.

The main criteria for the technical inspection of real estate
The technical inspection of buildings described in this article is the most important component of the operation process. various objects, which allows you to increase the safety of the use of buildings and structures. At the same time, the owners of the facilities must independently control the timing of construction expertise, and, if necessary, initiate such events.